The Zonal Railways are responsible for approving non-standard drawings of Railway...
Fully Killed Steel: Fully killed steel is steel in which all of the dissolved gases...
The Metallising & Painting Schedule for Steel Bridge Girders as per IRS B1 (Indian...
Sa 2.5 is a standard for surface preparation in the context of blast cleaning, specifically...
Sa 2.5 is a standard for surface preparation in the context of blast cleaning, specifically...
The latest RDSO instructions for designing Railway Over Bridges (ROB) girders focus...
Avoiding the mistake of welding shear studs after metallizing and painting operations...
The weld designations 1G, 2G, 3G, 4G and 1F, 2F, 3F, 4F refer to specific welding...
The document explains the basics of fatigue in steel, focusing on how repeated loading...
RDSO (Research Designs and Standards Organisation) standard Bow String Girder (BSG)...