The Zonal Railways are responsible for approving non-standard drawings of Railway...
Fully Killed Steel: Fully killed steel is steel in which all of the dissolved gases...
Choosing a fabrication inspection agency for a type of girder (such as steel or...
RDSO (Research Designs and Standards Organisation) standard Bow String Girder (BSG)...
Sa 2.5 is a standard for surface preparation in the context of blast cleaning, specifically...
Sa 2.5 is a standard for surface preparation in the context of blast cleaning, specifically...
The latest RDSO instructions for designing Railway Over Bridges (ROB) girders focus...
The approval process for Railway and Railway Over-Bridge (ROB) drawings related...
Avoiding the mistake of welding shear studs after metallizing and painting operations...
Special Vehicle (SV) Loading as per IRC 6 refers to a set of loadings designed to...