The approval process for Railway and Railway Over-Bridge (ROB) drawings related...
The document discusses how to address increased inter-girder spacing caused by seismic...
The document explains the basics of fatigue in steel, focusing on how repeated loading...
The latest RDSO instructions for designing Railway Over Bridges (ROB) girders focus...
The Metallising & Painting Schedule for Steel Bridge Girders as per IRS B1 (Indian...
The RDSO Height Gauge Drawing No. CBS 0051 is a standard design for the height gauge...
Fully Killed Steel: Fully killed steel is steel in which all of the dissolved gases...
Avoiding the mistake of welding shear studs after metallizing and painting operations...
Sa 2.5 is a standard for surface preparation in the context of blast cleaning, specifically...
Sa 2.5 is a standard for surface preparation in the context of blast cleaning, specifically...